We have planned the modification of the existing high voltage installations in the Mallorca Environmental Technologies Park, to adapt the installations to the changes introduced in the R.D. 900/2015, carrying out the following actions:
· Installation of a new double control and measurement center for a self-consumption installation.
· Modification of the inner medium voltage ring.
· Incorporation of a new generator set.
· Installation of a new double control and measurement center for a self-consumption installation.
· Modification of the inner medium voltage ring.
· Incorporation of a new generator set.