TIRME HIGH VOLTAGE ELECTRICAL SYSTEM

We have planned the modification of the existing high voltage installations in the Mallorca Environmental Technologies Park, to adapt the installations to the changes introduced in the R.D. 900/2015, carrying out the following actions:
· Installation of a new double control and measurement center for a self-consumption installation.
· Modification of the inner medium voltage ring.
· Incorporation of a new generator set.
Year
2019